Day plan

Monday, September 7

Improvement
Morning
5:15Wake, kiss LA on the forehead
5:16Text mom
5:17Text dad
Morning routine. Water, cats, litter, cold plunge, face wash, dressed, deodorant, clothes packed.
6:05Gym parking lot, via two 7-Elevens. Gas and three energy drinks.
6:15Starbucks, five minutes out. The lot had no connection.
7:25Day plan built and deployed
8:00MSF-01 spec write finished
8:00Workout view built, workouts/2026-09-07.html
8:15Left for the gym
9:45Workout done. Roadmap pushed to a PR from the car, MSF-02 kicked for the last six decisions.
10:50Home. Shower, then Meal 1. Three tabs generating.

Nineteen of the twenty shared foundation specs are written. SF-05 Resident Consent Model is the only one left, and it sits under MSF-02 Consent Model, the last master with anything outstanding. Today's MSF-02 pass covers all three of its foundations, SF-05, SF-06 and SF-20, so the two that already exist can be rewritten.

Rebuilt from 10:20, in the car. Supply 345, priced demand 309, and the 36 left over all belongs to one lane: reading Yash's timeline and building your own plan from today to October 1. That lane is not estimated. It is the residual, it takes whatever is left, and it is the only thing on this page that is still open at 7:30 by design.

The workout ran 75 minutes instead of 60 and the shower moved home, so work starts at 11:25 rather than 10:35. That is 50 minutes of supply, and MSF-02 gained a 15-minute intake session. The October 1 planning block went from 101 minutes to 36.

The work day
6:15 to 8:15
T1 MSF-01 specs T2 MSF-02 close T3 Life folder
MSF-01 closed. Done.

Two hours at Starbucks before the gym

A spec write finished, a whole planning system built from nothing, and the last master's decisions still running.

8:15Drove to the gym.
8:30 Workout, 8:30 to 9:45. Done →
9:45In the car. Roadmap pushed to a PR, and the MSF-02 tab kicked for the last six decisions.
10:50Home. Shower, dress, deodorant. 15 minutes.
11:05Meal 1, breakfast style. 20 minutes. Three tabs generating through it.
11:25 to 1:30
T1 MSF-02 chain T2 Visual assets T3 Consent texts
115 of 115 min on you

Kick three, then work them

Everything else today is downstream of three kicks made in the first five minutes. The MSF-02 chain is four links deep now and each one gates the next, so its review always goes first.

MSF-02 is a four-link serial chain and it closes about 2:15. Decisions, then intake at 30 clock, then the plan at 45, then the write at 35. 110 minutes of generation and 60 of you. Every minute the review waits moves the close by a minute, four links down, which is why it is the first thing you touch and not the third.
1:30Meal 2, meat veg carb. 20 minutes. Every tab keeps running.
1:50 to 4:15
T1 SF-05 write T2 Website T3 Consent texts
130 of 130 min on you

Close the program, clear the website

The MSF-02 write closes the twenty-spec program. The Elementor build and the intake form clear everything your COO is waiting on. The consent texts take their middle 45. Full block, no slack in it.

The Elementor number is a guess and the only one on this page. 30 active came off the calibration table's widget-placement row, not off you. If it runs to 60, the October 1 planning block pays for it and nothing else moves.
4:15  ·  The hinge of the day

Kick before the keys, not after

4:15Out the door. Driving LA to work and back.
5:30Back at the laptop.

Seventy-five minutes away. With tabs running that is 75 free minutes on the October 1 plan. With nothing running it is 75 minutes gone and the block on the other side starts with dead air.

The planning block is the only thing on this page that pays. Every overrun today, the Elementor build, the images, the consent texts running past 75, a missed kick at 4:15, comes out of the same 36 minutes. Nothing else on the board moves, which is why the load bars downstream all read 100%.
4:15Driving LA to work and back, home 5:30.
5:30 to 6:45
T1 Consent texts T2 Oct 1 plan
55 of 55 min on you

The last stretch

Meal 4 is in this window and costs 20 of its 75. The consent texts take their last 15, and everything after that is the October 1 plan.

Read Yash's timeline before you plan against it. It is on origin/chore-oct1-tracker at docs/oct-1-roadmap/tracker/, PR #1856, open. It models one SPEC-MSF-xx per master and knows nothing about the decisions-then-spec split, so it understates you badly: it still shows six of your spec work units as todo when nineteen specs exist. Its statuses are hand-synced and lag. Today is Labour Day and his board excludes it, so nothing new lands on it while you read.
6:45 to 7:30
  Tomorrow
45 of 45 min on you

Tomorrow's plan

Inside the cutoff today, not after it. Forty-five minutes, so the cutoff is really 6:45 for work.

Tomorrow's plan has to reckon with Thursday, not just tomorrow. The haircut is booked for Thursday 10 September at 11:15, two hours door to door, and it clears the beard trim in the same trip. Your mom and stepdad land Thursday 10pm and leave Sunday 10:50pm, and those three days are visit days that contain some work, not work days that contain some visiting. Friday is the only one of them that is a working day on Yash's timeline. Two things still have no answer: the airport runs, and how many active minutes Friday, Saturday and Sunday each get.
Commitments
If it goes sideways, cut from the bottom
  1. The October 1 planning block. It is the residual, so it carries rather than gets cut. Whatever is open at 6:45 is the first thing tomorrow, and this week has a haircut on Thursday and three visit days after it.
  2. The Elementor build of the installer page. Only if the images run long. Cut the build and keep the images: the images are the part that cannot be redone in ten minutes tomorrow, and the build needs them to exist either way.

Nothing else is on this list. The MSF-02 pass is 35 minutes of you and it closes a program that has been running since August 24.

Never cut
MSF-02 decisions reviewed first, at 11:25 SF-05 Resident Consent Model written OPS-CONSENT-TEXTS kicked at 11:25 Intake form kicked by 2:45 Everything kicked at 4:15 Tomorrow's plan starts 6:45 7:30, laptop shut
End of day, did it hold?